![Lilybank Extension Detail](/media/23670/extension detail_600x800.jpg)
The scaffolding was fully dropped last week which, for the first
time, afforded a full appreciation of the marriage of old and new:
the old stone elevation repaired with new stone and infilled with
new windows; the new roof and the new extension.
Clad in slate and zinc, the new building replaces the previous,
smaller building which had fallen badly into a state of
disrepair.
![Lilybank Rear Extension](/media/23665/extension_600x306.jpg)