Lilybank Terrace - Roof Works

Roof 1

The primary steel for the roof is now fully installed and, with the decking at second floor level now in place, one is afforded a full sense of the character and proportion of these new spaces within the roof volume.

With the purlins in place, the Contractor has commenced work on sheeting the sloping surfaces of the roof with the plywood substrate ready for the installation of the slate roof covering.

In the coming days, the conservation rooflights will be installed and the metal sheet decking to the flat portion sof the roof will complete the envelope.

Elsewhere, the stone pediments to the front elevation are being erected with a mixture of new stone and stone from the fire damaged building.

Roof 2